The two Midwest conversion routes have similar production costs; the larger difference is between their complete project designs and the Texas DAC/hybrid case. Selected model results follow power and carbon choices through operations, cost and the selling price required by the producer.

Contents

Supply configuration creates the larger cost difference

The Midwest Fischer-Tropsch (FT) and methanol-to-jet (MTJ) designs cost $5,851.78/t and $5,879.03/t before support. The Texas FT design, with direct air capture (DAC) carbon and owned hybrid generation, costs $6,610.86/t. The larger cost difference in this comparison comes from the complete supply configuration.

Power and carbon arrangements change the cost structure substantially. The synthesis process must work with the hydrogen supply it actually receives. Financing then determines the selling price needed to meet the sponsor's return requirement.

Connect the physical project to its commercial requirement

Connect the design to the commercial decision

From inputs to saleable fuel

  1. Power, hydrogen and carbon
    Electricity supply, electrolysis and delivered CO₂Feedstock supply
  2. Buffer and conversion
    Hydrogen availability, synthesis feed and pathwayProduct output
  3. Jet and coproducts
    Jet, naphtha and LPG on an explicit allocation basisJet-attributed costs

What the project must earn

  1. Production economics
    Capital, operating cost and modeled supportGross and net jet cost
  2. Commercial requirement
    Debt, tax, coproduct revenue and equity returnRequired jet selling price

Connect power, carbon and conversion choices to the revenue needed to meet the sponsor's return.

Model map. Follow power, carbon and conversion into the product slate, production cost and required selling price.Source: CovalentIQ model v1.6 · issued 19 October 2026.

Connect power, hydrogen and carbon to the saleable product slate, then trace the investment and cash flows. Assessing a contract price also requires buyer evidence, including the value of meeting a mandate and the terms a buyer would accept.

Carbon and capital define the Texas cost structure

Texas · FT · DAC

Fischer–Tropsch; direct-air-capture CO₂; hybrid renewables and battery; hourly matching.

What builds the production cost?

USD/t jet
  • Carbon feed
  • Capital
  • O&M
  • Replacement
  • Other costs
  • Eligible statutory support
  • Subtotal / total

Scroll across to see all cost components.

Production cost includes eligible statutory support. Required selling price also reflects financing and the sponsor's target return.

Figure 1. Selected US design cost buildup, real 2026 USD/t jet. Gross cost less eligible statutory support gives net cost. The cases assume a qualifying 2027 construction start.Source: CovalentIQ model v1.6 · issued 19 October 2026.

Capital contributes $3,579.38/t and carbon feed $1,878.88/t to the Texas case's gross cost. The design supplies electricity through owned renewable generation and battery assets, putting their cost into the investment budget. Purchased energy is zero.

Assess the synthesis quotation alongside the combined asset budget, generation performance and delivered-carbon terms. The full Excel workbook lets a team change those assumptions together with the pathway, power stack and plant scale, then follow their effects through the production chain.

Eligible statutory support reduces the Texas result to $5,819.51/t net cost. The separate selling-price calculation addresses the sponsor's revenue requirement under the financing assumptions.

The supply configuration deserves an early comparison

Compare the support assumptions

Solid negative bars show eligible statutory support. Filled markers show net production cost.

US designs with a qualifying 2027 construction start

USD/t jet
  • Net cost

Select a cost category to see its value in every design.

Texas · FT · DAC
Fischer–Tropsch; direct-air-capture CO₂; hybrid renewables and battery; hourly matching.
Eligible statutory support: -791.35 USD/t jetCarbon feed: 1878.88 USD/t jetCapital: 3579.38 USD/t jetO&M: 934.52 USD/t jetReplacement: 209.12 USD/t jetOther costs: 8.96 USD/t jet
Net cost5819.51Before 6610.86
Midwest · FT · ethanol CO₂
Fischer–Tropsch; ethanol-derived CO₂; 24/7 PPA; hourly matching.
Eligible statutory support: -969.25 USD/t jetCarbon feed: 251.29 USD/t jetPurchased energy: 3491.11 USD/t jetCapital: 1523.52 USD/t jetO&M: 411.87 USD/t jetReplacement: 165.12 USD/t jetOther costs: 8.86 USD/t jet
Net cost4882.53Before 5851.78
Midwest · MTJ · ethanol CO₂
Methanol-to-jet; ethanol-derived CO₂; 24/7 PPA; hourly matching.
Eligible statutory support: -983.21 USD/t jetCarbon feed: 260.25 USD/t jetPurchased energy: 3541.42 USD/t jetCapital: 1508.22 USD/t jetO&M: 401.03 USD/t jetReplacement: 159.11 USD/t jetOther costs: 8.99 USD/t jet
Net cost4895.82Before 5879.03

The designs assume qualifying 2027 construction starts and 2031 commercial operation. Filled negative bars deduct the levelized 45V support allocated to jet output. Midwest CO₂ is supplied at capture, conditioning and transport cost, with zero supplier opportunity premium. Figure 4 shows required selling prices under the same support assumptions.

Available conditional contracts also change financing assumptions or depend on unsettled terms. A numerical award comparison requires those terms to be matched.

Support assumptions
All three US designs · eligible 45V hydrogen credit

The model assumes construction begins in 2027, commercial operation in 2031 and ten credit years, 2031–2040. Eligibility depends on the actual project meeting the construction, hydrogen-emissions and other requirements.

The scenarios assume the full modeled rate of $3.28/kg H₂, held flat in real 2026 USD, with prevailing-wage and apprenticeship requirements met. They assume qualifying hourly-matched electricity, incrementality and deliverability; the model’s hydrogen policy-view emissions are below the 0.45 kg CO₂e/kg H₂ full-rate threshold.

The model applies direct pay in 2031–2032, then a 0.92 monetization factor for transferred credits. The bars include that timing and discounting, with support allocated consistently to jet output under energy allocation.

Actual support payments depend on project eligibility. These cost comparisons include 45V alone; they exclude 45Z, competitive awards and buyer-compliance value.

Carbon supply and implementation

Both Midwest designs assume cost-based access to fermentation CO₂. The workbook separately tests an illustrative $85/t CO₂ supplier opportunity premium.

Methanol was approved as an ASTM D7566 Annex 5 feedstock in July 2026. The proposed MTJ plant needs evidence for scale, yields, reliability and licensor guarantees.

Potential contracts and buyer value

A numerical conditional case needs the same physical design and financing assumptions, with explicit price, volume, term and reference-price settlement. No such matched case is available for this edition.

Mandates and compliance benefits affect the buyer's economics. Producer cash support enters the required selling price, which reflects the sponsor's target return and financing assumptions.

Figure 2. Three complete US designs with qualifying 2027 construction starts, real 2026 USD/t jet under energy allocation. Midwest CO₂ supply is cost-based, with zero supplier opportunity premium. Filled negative bars deduct eligible 45V support; required selling price is calculated separately. Potential contract awards remain outside this comparison.Source: CovalentIQ model v1.6 · issued 19 October 2026.

The Midwest FT design has much smaller capital and carbon contributions: $1,523.52/t and $251.29/t. It carries $3,491.11/t of purchased energy. Both Midwest designs assume cost-based access to fermentation CO₂: capture, conditioning and transport, with zero supplier opportunity premium. An integrated owner or a cost-plus supply contract could support that assumption. An independent buyer would need a supply offer that establishes the delivered price and available volume.

The model adds $23/MWh to the earlier US new-build power purchase agreement (PPA) assumption, taking this case to $84/MWh. The adjustment represents assumed post-credit power economics; market pricing needs to be verified with suppliers. It raises the Midwest production cost materially. The Texas design owns its generation, so the adjustment leaves its costs unchanged.

The nearby MTJ case has a very similar gross cost. The revised power assumption narrows the advantage over Texas, but the difference between the two complete supply configurations remains much larger than the difference between the Midwest conversion routes. Compare feasible carbon and power arrangements early, before narrowing the discussion to conversion technology.

MTJ remains an emerging commercial configuration. Methanol became an approved feedstock under ASTM D7566 Annex 5 in July 2026, and process scale-up continues. Commercial selection needs evidence for the proposed plant's yields, reliability and licensor guarantees. Fraunhofer ISE describes the approval and development work.

For these designs with a qualifying 2027 construction start, the eligible 45V hydrogen credit contributes a levelized $791.35/t of jet in Texas, $969.25/t in Midwest FT and $983.21/t in Midwest MTJ. After those deductions, net costs are $5,819.51/t, $4,882.53/t and $4,895.82/t respectively. The same statutory rate produces different effects per tonne because the complete designs and allocation to jet output differ.

The Before support view holds the same designs and removes the incentive deduction, showing how much of each cost advantage depends on eligibility. Several assumptions change together across these complete designs. Isolating the effect of carbon source, power contract or location would require holding the others constant.

Follow hydrogen through to synthesis

Texas · FT · DAC

Fischer–Tropsch; direct-air-capture CO₂; hybrid renewables and battery; hourly matching.

Hydrogen production and synthesis feed

kg H₂ per hour
  • Hydrogen produced
  • Synthesis feed
Hour 4009Hour 4056
Hydrogen produced
2031.67 kg H₂ per hour
Synthesis feed
3914.97 kg H₂ per hour

Hydrogen buffer at the end of each hour

kg H₂
  • Closing inventory
Hour 4009Hour 4056
Closing inventory
0.00 kg H₂

Hours 4009 to 4056 of the reference year show an operating example, with flow and inventory on their own scales. Annual performance requires the full year's operation.

Figure 3. Selected hours 4009 to 4056: hydrogen production and synthesis feed in kg H₂ per hour, with closing inventory in kg H₂ on a separate scale. The MTJ case has zero inventory during this interval.Source: CovalentIQ model v1.6 · issued 19 October 2026.

The selected Texas interval shows variable hydrogen production, inventory building and draining, and some hours when synthesis is idle. The Midwest FT case also has idle hours. In the MTJ case, synthesis keeps running during this interval while feed tracks hydrogen production and closing inventory remains zero.

Storage serves different roles under these operating rules, equipment sizes and feed requirements. Assessing the MTJ project's buffer requirement needs a full-year view of those conditions.

The full workbook follows an 8,760-hour reference year through the power, hydrogen and buffer/feed blocks. Use that detail to examine when an upstream supply constraint reaches synthesis, and whether an additional asset would earn its place in the project.

For analysts: what the hourly chart includes

All three views use original reference-year hours 4009 to 4056. Hydrogen production and synthesis feed are kilograms in each hourly interval; closing buffer inventory is kilograms on a separate scale. The MTJ zero-inventory line shows the model's calculated output.

Annual utilization requires the full-year results. The workbook also includes electricity, curtailment and other operating balances outside this excerpt. Power/H₂ and buffer/feed calculations have hourly resolution; downstream synthesis and product economics use annual calculations.

Financing determines the required selling price

What must each project receive for its jet fuel?

USD/t jet
Texas · FT · DAC
7191.50
Midwest · FT · ethanol CO₂
5598.30
Midwest · MTJ · ethanol CO₂
5947.43

Qualifying 2027 construction starts and 2031 commercial operation. Required prices include eligible 45V support and coproduct revenues under the sponsor-return assumptions.

Eligible statutory producer support and coproduct revenues already enter the price solve. The price meets the assumed sponsor return under each design's financing terms.

Figure 4. Required selling price for designs with qualifying 2027 construction starts and 2031 commercial operation, real 2026 USD/t jet. The sponsor-return calculation includes eligible 45V support and coproduct revenues.Source: CovalentIQ model v1.6 · issued 19 October 2026.

The Midwest FT and MTJ designs have almost identical net costs: $4,882.53/t and $4,895.82/t. Their required selling prices are $5,598.30/t and $5,947.43/t. The contract must meet the revenue requirement of the financed project.

Net cost allocates discounted costs and support to jet output. Required price follows construction spending, debt service, tax, coproduct revenues and incentives through the sponsor's cash flows. It solves for the jet price that meets the assumed equity return. These cash-flow assumptions determine the difference between the two measures.

Figure 4 applies to the same qualifying 2027 construction starts, with commercial operation in 2031. Required prices include eligible 45V support under the stated hydrogen-emissions and other conditions. A project beginning construction in 2028 loses access to 45V, so its required price must be assessed without that credit. Compare the applicable result with a buyer offer or an explicitly justified buyer-value assumption, including who receives any compliance benefit.

Keep potential contracts outside the baseline

A competitive contract could change the project, but its effect depends on the terms. Price, supported volume, duration, reference-price settlement and the financing assumptions can move together. Treating the full potential as a simple reduction in production cost would hide those dependencies.

The comparison offers Before support and Eligible support views. Potential contract awards remain outside these selected US results, which include eligible statutory producer support. In a project-specific assessment, compare a clearly defined contract with a matched no-award case, and trace both through required price and cash flow before presenting a benefit. Assess mandates and buyer-compliance value through the customer proposition; producer cash receipts depend on the commercial terms.

Test the assumptions that could change the choice

Texas · FT · DAC

Fischer–Tropsch; direct-air-capture CO₂; hybrid renewables and battery; hourly matching.

What moves the required selling price?

USD/t jet

Changes from 7191.50 USD/t jet. Each assumption changes separately.

Capex ±20%-980.02 / 980.02
CO₂ cost ±30%-739.50 / 739.50
Selectivity −10 pp (no upside)0.00 / 1012.22

Left: lower cost or price. Right: higher cost or price. One-sided results retain their direction.

Each assumption is tested separately against this design’s required selling price. The bars show calculated responses; the selectivity test is one-sided.

Texas tests capital, carbon and conversion performance. Midwest designs test contracted power, capital and conversion performance.

Figure 5. Selected changes in required selling price, USD/t jet. Texas shows capital, carbon and selectivity; Midwest views show contracted power, capital and selectivity. Each assumption changes separately.Source: CovalentIQ model v1.6 · issued 19 October 2026.

In Texas, a 30% delivered-CO₂ cost shift moves required price by $739.50/t. In the Midwest, a 20% bought-power price shift moves it by $933.79/t for FT and $1,015.83/t for MTJ. Those power-price effects are more than twice the corresponding capex sensitivities of $412.64/t and $438.13/t. For these two designs, the power agreement deserves scrutiny before a tighter equipment estimate.

The workbook also includes an illustrative $85/t CO₂ supplier opportunity premium. This sensitivity tests how a competing outlet for biogenic carbon could affect the Midwest designs. A supply agreement should establish the premium, if any, that the project actually pays.

A ten-percentage-point reduction in jet selectivity raises required price by $1,012.22/t in Texas, $763.42/t in Midwest FT and $885.66/t in Midwest MTJ. Less jet output must carry the project’s economics when the product slate changes. Conversion performance and coproduct value therefore belong in the same commercial assessment as feedstock supply.

For analysts: model boundary, financing and commercial assumptions

Values are real 2026 USD/t jet with the selected energy-allocation convention. Jet, naphtha and LPG allocation and coproduct revenues need consistent treatment. Regional CO₂ costs can be declared stand-ins: verify availability, specification and delivered cost. Validate support, tax and carbon-accounting assumptions against the project's certification and eligibility requirements.

The sensitivity chart measures changes in required selling price. Texas covers capital, carbon and one-sided selectivity tests. The Midwest views cover PPA price, capital and one-sided selectivity tests. Shifts differ in size; selectivity is one-sided. The ranking reflects the effect of those specified changes, with no probabilities assigned. The price solve uses linear sponsor tax with immediate loss use; the separate lender view carries losses forward without an 80% limitation. Working capital, decommissioning and salvage are excluded.

Test the project you could actually deliver

The e-SAF Excel model provides editable inputs, the complete operating year and seventeen sensitivity drivers. It includes 17 prepared designs plus CUSTOM. Compare pathways and allocation choices, then follow your assumptions into required price, project cash flows, equity returns and debt coverage through support changes. Technical and quick-start guides accompany the documented input sources.

Bring the carbon terms, power arrangement, conversion evidence and financing assumptions that your team needs to defend. CovalentIQ can help shape the alternatives and identify the commercial evidence still needed from suppliers, partners and buyers.

Explore the e-SAF model or discuss your project.

Take this paper with you

Download the PDF edition.

A PDF matching this article is available free with an email address. Marketing updates are optional.

Your email is used to record this download. Marketing consent is optional and does not affect access.

The model behind this paper

e-SAF Price & Mandate-Gap Model

Single-organization license

Direct purchase: Coming soon
Discuss model access

One-time organization license.

Already purchased? Get an access link
Download the PDF (free)

Your email is used to record this download. Marketing consent is optional and does not affect access.

The package includes the workbook, a release-matched technical guide, quick-start guidance and license terms. The guide explains the scope, methodology, workbook structure and limitations.

Explore the model →Discuss your aviation-fuel project